used amat centura

8-Inch Centura II DPS Tool, Used and Deinstalled

Chinsortech offers a used Applied Materials Centura II DPS identified as serial number 9532 and Tool ID DRP1P3. The unit is presented in used, as-is, deinstalled condition. Request the current configuration record, included hardware list, inspection scope, price, and delivery plan for your fab or refurbishment project.

Identify the Exact Centura Configuration

Centura names cover multiple equipment generations and process families. A platform name alone does not define the installed process, chamber hardware, wafer size, or revision. This offer is identified as a Centura II DPS tool for 8-inch wafers, serial number 9532, Tool ID DRP1P3, in used and deinstalled condition.

Before purchase, match the machine record in this order:

  1. Mainframe and identity: Centura generation, serial number, Tool ID, nameplate photos, and deinstallation record.
  2. Process family: Confirm DPS metal, polysilicon, deep-trench, or another installed etch configuration. DPS and DPS Plus are not interchangeable names.
  3. Wafer handling: Verify the 200 mm wafer format, load locks, robot, orienter, slots, carriers, and transfer interfaces.
  4. Chamber map: Record every process and auxiliary chamber by position, model, serial number, hardware revision, and present condition.
  5. Supporting subsystems: List generators, matching networks, pumps, valves, gas delivery, temperature control, endpoint hardware, system controller, software version, and safety interlocks.

Use the present installed hardware and modification history as the source of truth for a previously operated tool.

Request the Configuration Record

What to Request Before Comparing Quotes

A comparable used-tool quotation needs a defined equipment boundary. Ask the seller to identify the exact included modules and the evidence available for each condition statement.

Quote itemInformation to record
IdentityMainframe model, serial number 9532, Tool ID DRP1P3, chamber list, module serial numbers, and hardware revisions
ConditionUsed, as-is, deinstalled; last operating date; reason for removal; storage conditions; known faults; missing parts
Included scopeLoad locks, robot, orienter, chambers, controller, racks, RF equipment, pumps, manuals, cables, fixtures, and spares
EvidenceNameplates, full-tool photos, chamber interiors, controller screens, maintenance history, alarm logs, deinstallation records, and inspection reports
Commercial termsPrice basis, payment term, packing, rigging, loading, trade term, destination, lead time, inspection access, and warranty if offered
AcceptanceDocument review, visual inspection, electrical and mechanical checks, leak or vacuum checks, functional demonstration, and agreed pass criteria
Send Your Required Scope

Available Used AMAT Centura Tool

The following product is the specified tool record supplied with this page.

E10-0015 DRP1P3 used AMAT Centura II DPS semiconductor equipment

E10-0015_DRP1P3 AMAT Centura II DPS

A used and deinstalled Applied Materials Centura II DPS for 8-inch wafers. The published product record identifies serial number 9532 and Tool ID DRP1P3. Request the chamber map, included subsystem list, inspection evidence, price, and delivery scope for the current offer.

  • Product recordE10-0015_DRP1P3
  • ToolApplied Materials Centura II DPS
  • Wafer size8 inch / 200 mm
  • Serial number9532
  • Tool IDDRP1P3
  • ConditionUsed - As Is / Deinstalled

Match Process Family, Chambers, and Wafer Format

Centura is a single-wafer, multi-chamber platform family used with different process products. The name that follows Centura changes the equipment context and the parts required for operation.

Name found in recordsProcess contextWhat must be confirmed
DPS or DPS PlusEtch product familyMetal, polysilicon, dielectric, deep-trench, or other exact application; chamber version; wafer size; source and bias hardware
DXZCVD product familyFilm application, chamber kit, gas distribution, heater, remote clean, and wafer size
Ultima HDP-CVDHigh-density-plasma CVDDeposition configuration, chamber generation, supporting RF and vacuum hardware
EpiEpitaxial silicon depositionEpi product generation, wafer size, chemistry, chamber configuration, and controls
RTP, XE, XEplus, or RadianceRapid thermal processingThermal chamber generation, lamp and temperature-measurement hardware, wafer size, and control version

The offered record states Centura II DPS and 8-inch wafers. Confirm the installed DPS application and every chamber position before evaluating process suitability, spare compatibility, or refurbishment cost.

Discuss Process and Chamber Fit

Inspect the Tool Against an Agreed Acceptance Plan

Used and deinstalled status describes the commercial condition, not the present operating result. Build the acceptance plan around the intended reuse, refurbishment depth, and available facilities.

  1. Document and identity review: Match the mainframe, chambers, modules, serial numbers, revision labels, software, and included accessories to the quotation.
  2. External condition: Record impact damage, corrosion, missing covers, cut cables, disconnected tubing, contamination, storage exposure, and transport damage.
  3. Interfaces and motion: Inspect sealing faces, doors, slit valves, robot and wafer handling, connectors, cooling lines, gas paths, vacuum fittings, sensors, and interlocks.
  4. Subsystem checks: Where facilities and safe procedures permit, agree on electrical, motion, communication, pressure, leak, vacuum, pump, RF, temperature, and control checks that apply to the included hardware.
  5. Traceable exceptions: List every unavailable test, known fault, missing part, replacement recommendation, and open refurbishment item in the acceptance record.

Define who supplies utilities, fixtures, consumables, test wafers, pumps, abatement, installation labor, and process qualification. A visual inspection cannot establish vacuum integrity, electrical safety, process performance, or production readiness.

Define Inspection and Acceptance

Prepare the Site and Integration Inputs

Confirm the facility requirements from the exact configuration record and applicable installation documentation. Chamber count, pumps, abatement, RF hardware, controller generation, and local code requirements can change the site plan.

  • Tool footprint, service clearances, floor loading, vibration criteria, access route, rigging points, and installation sequence
  • Electrical supply, grounding, distribution, rack loads, emergency-off integration, and safety interlocks
  • Process gases, purge gases, compressed air, cooling water, exhaust, vacuum pumps, forelines, abatement, and leak-detection requirements
  • Facility interfaces, connector standards, flow and pressure requirements, drain or waste handling, and environmental controls
  • Host communication, factory network, software license status, data interfaces, recipes, backups, and cybersecurity controls
  • Cleanroom classification, contamination controls, decontamination evidence, packaging, unpacking, and move-in procedures

Use verified installation drawings and utility matrices for this serial-number configuration before construction or shipment.

Review Your Site Requirements

Set the Price, Delivery, and Service Boundary

The final price and lead time depend on the included hardware, current condition, inspection access, refurbishment scope, packing, logistics, destination, and required commissioning support. Ask for a written scope that separates the equipment sale from optional services.

Commercial boundaryPoints to state in the quotation
EquipmentExact mainframe, chambers, modules, racks, pumps, accessories, cables, manuals, spares, and excluded items
Condition and workAs-is sale, cleaning, decontamination, repair, refurbishment, parts replacement, cosmetic work, and tests included
InspectionBuyer inspection rights, location, test utilities, demonstration limits, records, and acceptance timing
LogisticsDe-rigging, preservation, packing, shock or moisture controls, loading, insurance, trade term, route, and destination
Installation and supportMove-in, hook-up, start-up, calibration, process qualification, training, remote support, on-site support, and travel costs
Warranty and sparesCovered items, duration, start date, response path, exclusions tied to as-is condition, recommended spares, and parts availability

For the first inquiry, provide the intended process, fab location, required delivery date, expected acceptance level, and whether you need as-is shipment or a defined refurbishment and commissioning package.

Request a Defined Commercial Offer

Used AMAT Centura FAQ

What does used, as-is, deinstalled mean for this tool?

It means the equipment has been previously operated, removed from its former installation, and is offered without an implied production-ready result. The quotation and inspection record should state the included hardware, known faults, available tests, storage history, and any refurbishment or warranty offered.

Is Centura II DPS enough to confirm my process?

No. Confirm the exact DPS application, chamber positions and revisions, wafer format, source and bias hardware, pumps, controller, software, and installed process kits. DPS metal, poly, deep-trench, and other configurations can require different hardware and acceptance criteria.

Can this tool process 200 mm wafers?

The published product record identifies the offered tool as an 8-inch system. Verify the installed load locks, robot, orienter, chambers, carriers, and process kits against the current configuration before relying on the wafer-size statement.

Can Chinsortech provide a fixed price immediately?

A final offer requires the equipment boundary, inspection and refurbishment scope, destination, packing and trade term, requested delivery date, installation support, and warranty requirements. Send those inputs so the quotation can identify what is included.

What should I provide with my inquiry?

Provide the intended process, fab location, required delivery date, preferred trade term, inspection expectations, desired refurbishment level, installation and start-up scope, and any required documentation. State whether pumps, abatement, RF equipment, racks, fixtures, manuals, spares, and software must be included.

Request Configuration, Inspection, and Quote Details

Send your intended process, fab location, required delivery date, inspection level, refurbishment scope, installation support needs, and required included hardware. Chinsortech can then confirm the current tool scope and prepare a defined offer.

  • Phone: 18015354460
  • Email: [email protected]
  • WhatsApp: 18015354460
  • Address: No.29-1, Huibei Road, Liangxi District, Wuxi City, China.

Direct contact: [email protected] | +86 180 1535 4460