applied materials centura ii

Review One Centura II by Asset Record

E10-0015 is listed as an 8-inch Applied Materials Centura II DPS in Used – As Is / Deinstalled condition. Use S/N 9532 and Tool ID DRP1P3 to turn a broad platform search into a quote-ready review of this specific asset.

Applied Materials is the original equipment manufacturer. Chinsortech handles this third-party equipment listing and the related configuration inquiry.

Freeze the Asset Identity Before Reviewing Capability

The words “Applied Materials Centura II” identify a platform generation, not a complete process configuration. Centura platforms have supported different process products, while DPS refers to Decoupled Plasma Source etch technology. A buyer therefore needs the platform, process family, installed modules, wafer format, controls, interfaces, and asset identifiers in one baseline.

Facts already tied to E10-0015

Baseline fieldPublished record
ListingE10-0015_DRP1P3-AMAT_Centura II DPS
PN shown on the listingAMAT Centura DPS
ToolApplied Materials Centura II DPS
Wafer format8-inch
ConditionUsed – As Is / Deinstalled
Serial number9532
Tool IDDRP1P3

Configuration fields to attach to the same record

Record every occupied and open chamber position, the full chamber designations, installed process kits, load locks, wafer-transfer hardware, pumps, RF and power equipment, gas and cooling hardware, controller and software versions, accessories, loose parts, and external facility interfaces. Each photograph, drawing, parts list, maintenance record, and test result should carry an asset, module, or document identifier that links it back to the baseline.

A reference to “DPS,” a similar-looking chamber, or another Centura II does not establish the installed etch application or hardware revision. Historical silicon, metal, and other DPS configurations can require different chamber hardware and acceptance criteria.

Build One Evidence Room for Engineering, Facilities, and Purchasing

A shared evidence room keeps technical suitability, site planning, and commercial scope aligned. Use a revision-controlled index with the document owner, issue date, revision, related asset or module, review status, and open questions for every item.

Review packageRecords to requestDecision supported
Asset identityMainframe and module nameplates, S/N 9532, Tool ID DRP1P3, equipment photographs, configuration record, and modification historyConfirms that each file and quoted item belongs to E10-0015
Installed process hardwareChamber map, full chamber names, installed kits, RF and power hardware, pumps, gas boxes, load locks, robot, orienter, and accessoriesDefines the equipment actually being evaluated and the gaps that remain
Controls and softwareController hardware, software version, available licenses, backups, I/O records, network interfaces, and known changesIdentifies startup dependencies and version-specific work
Condition historyDeinstallation record, last-known operating record, maintenance and fault history, cleaning or decontamination records, storage conditions, missing-parts log, and available testsSeparates documented condition from assumptions based on the model name or photographs
Site and EHS inputsLayout and service-clearance drawings, weight and rigging data, power, grounding, cooling water, gases, exhaust, vacuum, abatement, compressed air, and safety interfacesLets the receiving team review space, move-in, utilities, and safety requirements against the exact configuration
Delivery boundaryIncluded and excluded hardware, packing list, manuals and drawings, inspection access, test scope, preservation and packing, loading point, trade term, destination, and requested servicesCreates a comparable quotation and a checkable handoff

When two records conflict, keep both versions visible, name the conflict, and assign an owner and closure date. Freeze the accepted evidence index and configuration record as the revision cited by the quotation; later changes should identify the affected line items, cost, schedule, and acceptance steps.

Listed Applied Materials Centura II DPS

Reference E10-0015, S/N 9532, and Tool ID DRP1P3. State the intended process, required chamber configuration, inspection expectations, destination, and requested delivery scope.

Complete Applied Materials Centura II equipment in a cleanroom, with a visible SELL sign.

Full cleanroom view from the E10-0015 photo set. Confirm the installed configuration, included hardware, and condition evidence through the asset review.

E10-0015_DRP1P3-AMAT_Centura II DPS

This listing records a used, deinstalled Applied Materials Centura II DPS for an 8-inch wafer configuration. Use E10-0015, S/N 9532, and Tool ID DRP1P3 in the inquiry so the configuration file, inspection scope, and quotation remain attached to the same equipment.

  • PNAMAT Centura DPS
  • ConditionUsed – As Is / Deinstalled
  • ToolApplied Materials Centura II DPS
  • Wafer format8-inch
  • Serial number9532
  • Tool IDDRP1P3

Close the Review with Three Named Sign-Offs

The review advances when the responsible buyer-side owner signs each decision. A gate stays open when its required decision cannot be supported, even if the other two gates are ready.

GateClosure recordSuggested sign-off ownerKeep the gate open when
Asset identityApproved asset register and resolved conflict logEquipment engineer or asset ownerA critical identifier is unreadable, contradictory, or linked to a different asset
Intended-use reviewWritten fit assessment that names assumptions, unavailable tests, and required follow-upProcess owner with facilities/EHS input where applicableA required capability or interface depends on unidentified or unverified equipment
Purchase scopeApproved offer comparison and open-item registerProcurement with technical approvalA required item has no commercial status, owner, or acceptance treatment

Record the approver, decision date, referenced evidence revision, and remaining actions for each gate. A conditional approval should state the condition, responsible party, due date, and the purchasing decision that cannot proceed until closure.

Assign Review Owners

Give Every Open Item a Commercial Status

Assign each unresolved requirement one commercial status. The status controls whether its cost is in the offer, who must act, and whether purchasing can proceed.

StatusHow it appears in the offerRequired owner action
IncludedNamed deliverable, quantity or boundary, price treatment, and acceptance basisSeller confirms the deliverable and evidence provided
ExcludedExplicit exclusion with the affected interface or dependencyBuyer decides whether the exclusion is acceptable or requires another source
OptionalSeparately priced scope with schedule effect and acceptance basisBuyer accepts or declines the option before the stated validity point
Buyer-suppliedBuyer-owned item or service, required date, interface, and readiness conditionBuyer assigns the supplier and confirms availability
Pending verificationOpen question, evidence or inspection needed, responsible party, and closure dateBoth parties resolve it before the gate named in the offer

For a CIF request, include the destination port. For any requested delivery term, provide the receiving location, target date, access constraints, and required shipping documents.

Inspect What the Records Cannot Prove

Plan inspection around the decision that remains open. The listed condition is Used – As Is / Deinstalled, so a photograph or product label can establish identity or visible condition but cannot establish vacuum integrity, electrical safety, motion performance, software readiness, or process results.

Evidence stageChecks to defineDecision supported
Records and photo reviewLabels, module positions, included items, visible damage, disconnected interfaces, maintenance records, deinstallation records, and missing-document logConfirms the remote-review baseline and directs the physical inspection
Physical inspectionImpact, corrosion, residue, coating damage, sealing faces, doors, slit valves, robot and wafer handling, connectors, threads, gas and cooling ports, cables, and missing partsRecords accessible physical condition and verifies interfaces against the agreed checklist
Functional checks, when expressly availableApplicable motion, position, limits, interlocks, communications, pressure or leak checks, vacuum equipment, RF or power, temperature, sensors, and controlsAdds function-specific evidence under named utilities, methods, limits, and witness conditions
Shipment and receivingFinal photo record, packing list, preservation, shock or moisture controls, package condition, quantity, transport damage, and open-item listPreserves the handoff record and supports receiving inspection and claim handling

Write unavailable tests and unresolved exceptions into the acceptance record. If a powered demonstration, refurbishment, installation, commissioning, or process qualification is required, request it as a separate quoted scope with the necessary site conditions and pass/fail criteria.

Define the Inspection Scope

Request an E10-0015 Configuration Review

Send the intended process and the configuration evidence you already have. Chinsortech can review the inquiry against the listed asset and define the information needed for a scoped quotation.

  • Phone: 18015354460
  • Email: [email protected]
  • WhatsApp: 18015354460
  • Address: No.29-1, Huibei Road, Liangxi District, Wuxi City, China.

Describe the required equipment boundary and list any chamber, document, test, packing, logistics, or support items that must appear in the quotation. Reference E10-0015, S/N 9532, and Tool ID DRP1P3; include the intended process, required configuration records, inspection scope, destination, and target schedule.